The Clock Tower is Dufftown’s most famous landmark. In 2020 the DDCA bought it from Moray Council to keep it in community hands, and now we’re working to restore it and give it a new life at the heart of the town.

Where we are now
The Clock Tower belongs to the community. The DDCA bought it from Moray Council in 2020, and we now have planning permission to give it a new life. The ground floor will become a community space, and the three floors above will be turned into unique holiday accommodation. Outside, we’ll add interpretation boards telling the tower’s story and make the area around it more welcoming for locals and visitors alike.
What’s next
The Clock Tower belongs to Dufftown, and our aim is to make it a building the community can truly use and enjoy, not just admire from the street. Between now and May 2027, we’ll be getting the project ready for the building work to begin. This stage of the project is made possible with a development grant from The National Lottery Heritage Fund, with thanks to National Lottery players.
At the heart of this is working with the community. We’ll be talking with local people and groups throughout, to find out how they’d like to use the ground-floor community space and what would make it most valuable to the town and surrounding area. We want the Clock Tower to be a real community asset: a place for local people to meet and gather, and a wonderful experience for visitors that everyone in Dufftown can be proud of.
To make this happen, we’re putting together a project team, including a project manager, interpretation and heritage consultants, an interior designer and an architect-led design team. We’ll also be finalising our funding strategy, so that we’re ready to deliver the capital works to restore and transform the building.
Our story so far
-
Summer 2016
Moray Council switches off the clock because of budget cuts. The DDCA agrees a maintenance arrangement, rewires the power supply and gets the clock going again.
-
March 2020
After 18 months of negotiation, the DDCA takes ownership of the Clock Tower. Thanks to donations and volunteer time, the transfer costs the community nothing.
-
March 2021
Conservation architect Angela Dow carries out a survey of the building’s condition and costs the repairs.
-
July 2022
With support from Highlands and Islands Enterprise, we appoint Delfinity to help plan the building’s future.
-
August 2022
Our Clock Tower abseil with Outfit Moray raises £1,894 for urgent repairs. At a public meeting, residents share their views on future uses (see the meeting slides).
-
November 2022
The Clock Tower business plan sets out options for future use, with cost estimates.
-
May 2023
A conservation architect and design team are appointed to develop detailed plans, funded by the Architectural Heritage Fund and the William Grant Foundation.
-
May 2025
Planning permission is granted to turn the Clock Tower into a community space with holiday accommodation above.
-
September 2026
Funding awarded from the EDF Renewables Dorenell Wind Farm Community Benefit Fund.
-
October 2026 Latest
Development grant awarded from The National Lottery Heritage Fund, with thanks to National Lottery players.
This project has been made possible with support from:




How you can help
- Join the Clock Tower Fundraising Club – £12 a year, with a quarterly prize draw.
- Make a donation – every pound goes towards keeping the clock ticking.